Loading ...
from $978.00

An on lot infrastructure fee is required for all new connections. The fee is for the supply and installation of the sustainable water infrastructure kit, including the pressure sewer pump, control panel, recycled water meter and hardware associated with the remote monitoring system.

Fees vary based on developer contributions on a regional basis, please refer to your sales disclosure notice for further detail.

Please note that a pump out service is not included within this fee, you could pay upon pre-connection inspection or pay for it separately here.

Please select the applicable community:

related products

altogether building approval
$54.00

An Altogether building approval is required on all lots that are serviced by Altogether Group in Box Hill (Gables), Cooranbong, Huntlee and Pitt Town.

altogether building approval (add on)
$54.00

If you are constructing an add on such as a pool, shed, shed with services, extension, deck or retaining walls please submit an Altogether building approval (add on). Please refer to Altogether standard drawings and guides prior to construction of your add on.

pre-connection inspection (with optional pump out)
$0.00

Once construction of your home is complete, you can start getting ready to move in by requesting a water and wastewater pre-connection inspection.

 

My Cart

your shopping cart is empty.

please click here to visit the shop.